Boulder Crest Retreat — Site Drainage & Grading
A flat 67-acre veterans' retreat that put ten acres under water every time it rained. We cut the property a new drainage network, top to bottom, without interrupting a single on-site program.

- Location
- Italy, Texas
- Contract value
- $800,000
- Site area
- 67 acres
- Duration
- 31 days
Scope of work
- 4,000 LF of 18" HDPE double-wall drainage main
- 3,000 LF of graded swales, 2–3" riprap to 1–2" river rock
- 200 LF of 12" French drain
- 400–600 LF of 4" French drain tied into existing lines
- 200 LF of gutter and collection
- 300–600 LF of PVC irrigation and sleeving
- Steel culverts with hard-cast concrete wing walls
- Pond inlet and swale improvement, roughly one acre of water
- Sod and turf reestablishment across disturbed ground
Site conditions
- Zero fall across most of the property — flat ground meant every foot of grade had to be manufactured.
- Active programming for combat veterans on site, so heavy equipment had to stay on the opposite half-mile of the property from whatever session was running.
- A 30-day owner mandate with material logistics for dirt, riprap, river rock and pipe running in parallel with production.
Outcome
Grades held to an eighth of an inch across every 1,600-foot laser shot. The first rain after completion moved exactly as designed — no ponding, no washouts. We regraded the arena and office approaches and laid an extra 300 LF of riprap at no additional cost.
Have a set of plans? Send them over.
We bid commercial sitework across DFW and North Texas — drainage, grading, excavation and structures. Plans in, numbers back fast.